electricity supply in South Australia was interrupted in the region under a black system across the state where renewable energy generation accounted for as high as 48. 36% and lasted for 50 hours until load was restored. This is the first regional blackout event in the world triggered by severe weather with large amounts of renewable energy that tripped off the grid. This paper describes the whole “9·28” blackout event step by step from pre-event generation power ratio
sequence of blackout evolution to post-event black system restart. The enlightenment of “9·28” South Australia blackout event to the safe operation of Chinese power system is summarized from different dimensions
like online calculation ancillary decision-making system
system moment of inertia
low voltage ride through requirement
low frequency load shedding and black system restart plan.
College of Electrical Engineering, Zhejiang University
State Key Laboratory of Renewable Energy Grid-integration (China Electric Power Research Institute)
Key Laboratory of Modern Power System Simulation and Control & Renewable Energy Technology, Ministry of Education (Northeast Electric Power University)
School of Electrical Engineering and Automation, Wuhan University
State Key Laboratory of Power Grid Environmental Protection (Wuhan University)