您当前的位置:
首页 >
文章列表页 >
考虑实时和潜在因素的城市配电网风险评估模型和方法
更新时间:2025-08-13
    • 考虑实时和潜在因素的城市配电网风险评估模型和方法

    • Automation of Electric Power Systems   Vol. 41, Issue 4, Pages: 48-55(2017)
    • Published:2017

    移动端阅览

  • LIN Zizhao. [J]. Automation of electric power systems, 2017, 41(4): 48-55. DOI:

  •  
  •  

0

Views

3327

下载量

11

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

No data

Related Author

ZHENG Ran
LIU Baozhu
HU Junjie
XIE Dongliang
CHEN Zhilin
LIU Hao
BI Tianshu
HUANG Yu

Related Institution

State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources (North China Electric Power University)
State Grid Electric Power Research Institute (NARI Group Corporation)
Institute of Advanced Technology for Carbon Neutrality, Nanjing University of Posts and Telecommunications
NARI Group Corporation (State Grid Electric Power Research Institute)
National Engineering Research Center for Electrical Energy Conversion and Control (Hunan University)
0