low automation level of interactive process existing in the construction mode of power grid model center
a construction method for power grid model center is put forward based on the particle size of power plant/substation. Through a study of power grid model interaction technology and on-demand model proxy service mechanism with the particle size of power plant/substation
the model fusion
interaction efficiency
security and the model partition maintenance problems are solved in the construction of model center between dispatching systems. With an actual power grid as an example
it is verified that the proposed construction method is capable of improving the interaction efficiency
model quality
and automation maintenance level in the building of model center
as well as solving the problems of the heterogeneous scheduling system to be integrated into the model center.