您当前的位置:
首页 >
文章列表页 >
基于净负荷分步建模的旋转备用优化确定风险分析方法
更新时间:2025-08-13
    • 基于净负荷分步建模的旋转备用优化确定风险分析方法

    • Automation of Electric Power Systems   Vol. 39, Issue 24, Pages: 16-22(2015)
    • Published:2015

    移动端阅览

  • ZHANG Liudong. [J]. Automation of electric power systems, 2015, 39(24): 16-22. DOI:

  •  
  •  

0

Views

2638

下载量

6

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Online Evaluation Method for Transient Active Power Support Capability of Wind Farm Considering Wind Speed Uncertainty
Inter-basin Scheduling Method of Cascaded Hydropower Plants Considering Multi-grid Peak Shaving and Hydropower Accommodation
Day-ahead and Real-time Clearing Method of Integrated Energy System Considering Interest Balance Between Multiple Entities
Design and Practice of Peak Regulation Auxiliary Service Market for Central China Power Grid Considering Positive and Negative Spinning Reserve

Related Author

WU Linlin
DONG Yu
SUN Rongfu
DING Ran
FENG Shuaishuai
QI Pan
FENG Shuaishuai
Chuntian CHENG

Related Institution

Electric Power Research Institute of State Grid Jibei Electric Power Co., Ltd.
School of Electrical Engineering and Automation, Wuhan University
State Grid Jibei Electric Power Company Limited
National Power Dispatching and Control Center, State Grid Corporation of China
Institute of Hydropower and Hydroinformatics, Dalian University of Technology
0