During the process of network reconfiguration after blackouts
overloading of the restored transmission lines may occur due to pickup of a major load. An optimization control method is proposed by amending the network structure. For the overloaded lines
all the feasible paths that can mitigate the occurred overloading are found out from the unrestored network to constitute a set of optional paths. The optional paths are evaluated and ranked by the effect of subsequent recovery
over-load elimination
operating status
as well as the complexity of the recovery operation. The sorted path set can be the network adjustment strategy for reducing the line overloading. The proposed network adjustment strategy is validated by the simulation results on the IEEE 39-bus power system. This work is supported by National Natural Science Foundation of China (No. 51277076) and Fundamental Research Funds for the Central Universities (No. 2014XS75).
Optimization of Post-typhoon Rush Repair Strategy for Distribution Network Considering Information Integration of Traffic Network and Distribution Network
基于PSD-BPA的电网运行方式数据自动整合与调整方法
基于失电风险最小的机组恢复顺序优化方法
考虑电动汽车支持的电力系统恢复多目标最优策略
基于模糊机会约束规划的电力系统网架重构优化
Related Author
Chen YU
Shangxuan LI
Yunyun XIE
Shaofeng LIU
Kang CHANG
ZHANG Yuechi
LIU Yan
LIU Weijia
Related Institution
NARI Group Corporation(State Grid Electric Power Research Institute)
State Key Laboratory of Smart Grid Protection and Control
Tongxiang Power Supply Company of State Grid Zhejiang Electric Power Co., Ltd., Tongxiang
School of Automation, Nanjing University of Science and Technology
Institute of Hydropower & Hydroinformatics, Dalian University of Technology