基于两阶段规划法的有源配电网综合电压优化控制
摘要
针对目前有源配电网调压对象单一且分布式电源(DG)和传统调压手段协调性差的问题
提出了一种基于两阶段规划的有源配电网综合调压方法。首先
通过第2阶段确定分接头位置和电容器投入组数的状态
并由差分进化算法确定第1阶段各个时段内各DG的最佳有功和无功输出。然后
将第1阶段的DG最佳输出反馈给第2阶段
再根据动态规划(DP)算法确定次日最优的电压控制预案。MATLAB仿真算例表明
与传统调压法相比
所提的两阶段规划法可更好地协调DG的出力。
Abstract
In order to solve the problem of active power optimization being usually singleobject oriented and the coordination between distributed generators (DGs) and traditional voltage control method being poor
a comprehensive voltage control optimization using the twostage planning algorithm is proposed. Firstly
the differential evolution algorithm is used to obtain the feasible state when the status of underload tap changer (ULTC) and shunt capacitors is determined by the second stage. Then the DG optimal output from the first stage is fed back to the second stage
and the optimal values of the objective function are calculated by the dynamic programming algorithm while the voltage control plan for dayahead is obtained. Finally
the proposed method is implemented in MATLAB
its effectiveness in the coordination of DG output verified by simulation cases. This work is supported by National Natural Science Foundation of China (No. 51207051).