您当前的位置:
首页 >
文章列表页 >
考虑跨区直流调峰的日前发电计划优化方法及分析
更新时间:2025-08-13
    • 考虑跨区直流调峰的日前发电计划优化方法及分析

    • Automation of Electric Power Systems   Vol. 39, Issue 16, Pages: 138-143(2015)
    • Published:2015

    移动端阅览

  • HAN Hongwei. [J]. Automation of electric power systems, 2015, 39(16): 138-143. DOI:

  •  
  •  

0

Views

2489

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Reliable Regulation Capability Extraction Strategy for Cluster Electric Heating Load Considering Average Heating Demand
Development and Engineering Application of Controllable Line Commutated Converter
Optimal Dynamic Response Strategy for Supercapacitor Participating in Wind Power Frequency Regulation
Discussion on Basis and Coordination Relationships of Settings for High Voltage Direct Current Transmission Protection

Related Author

YAN Gangui
LYU Shuaishuai
MU Gang
JIANG Jing
ZHANG Liwei
XING Aolan
HE Zhiyuan
GAO Chong

Related Institution

Key Laboratory of Modern Power System Simulation and Control & Renewable Energy Technology, Ministry of Education (Northeast Electric Power University)
State Key Laboratory of Advanced Power Transmission Technology (State Grid Smart Grid Research Institute Co., Ltd.)
Beijing Key Laboratory of High Power Electronics (State Grid Smart Grid Research Institute Co., Ltd.)
State Grid Shanghai Municipal Electric Power Company
Key Laboratory of Guangxi Electric Power System Optimization and Energy-saving Technologys (Guangxi University)
0