In view of the uncertainty of operating time and recovery reliability of lines put into operation during network reconstruction after blackout
a fuzzy chance constrained model of optimization of power network reconfiguration is proposed based on the fuzzy chance constrained programming theory. Triangular fuzzy variables are used to represent the line’s operating time and recovery reliability
and the recovery reliability index is defined to evaluate the objective network. The target is to ensure that the possibility of a unit’s restoration in its start-up time requirements is no less than a certain level of confidence
and to obtain the optimized network that reaches the highest reliability in a shortest possible time. The fuzzy simulation based cross particle swarm optimization is used to optimize the node restoration sequence
and the Dijkstra algorithm is combined to choose the restoration path. Finally
the effectiveness of the proposed method is validated by an IEEE 30-node system and part of Yunnan power system. This work is supported by National Natural Science Foundation of China (No. 51277076).
Optimization of Post-typhoon Rush Repair Strategy for Distribution Network Considering Information Integration of Traffic Network and Distribution Network
网架重构过程中线路潮流越限消除的网络调整策略
基于失电风险最小的机组恢复顺序优化方法
考虑电动汽车支持的电力系统恢复多目标最优策略
基于模糊相关机会规划的储能优化控制
Related Author
Chen YU
Shangxuan LI
Yunyun XIE
Shaofeng LIU
Kang CHANG
GU Xueping
LIU Yan
LIU Weijia
Related Institution
NARI Group Corporation(State Grid Electric Power Research Institute)
State Key Laboratory of Smart Grid Protection and Control
Tongxiang Power Supply Company of State Grid Zhejiang Electric Power Co., Ltd., Tongxiang
School of Automation, Nanjing University of Science and Technology
School of Electrical Engineering, Zhejiang University