您当前的位置:
首页 >
文章列表页 >
基于模糊机会约束规划的电力系统网架重构优化
更新时间:2025-08-13
    • 基于模糊机会约束规划的电力系统网架重构优化

    • Automation of Electric Power Systems   Vol. 39, Issue 14, Pages: 68-74(2015)
    • Published:2015

    移动端阅览

  • ZHANG Xueli. [J]. Automation of electric power systems, 2015, 39(14): 68-74. DOI:

  •  
  •  

0

Views

2762

下载量

12

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Optimization of Post-typhoon Rush Repair Strategy for Distribution Network Considering Information Integration of Traffic Network and Distribution Network
网架重构过程中线路潮流越限消除的网络调整策略
基于失电风险最小的机组恢复顺序优化方法
考虑电动汽车支持的电力系统恢复多目标最优策略
基于模糊相关机会规划的储能优化控制

Related Author

Chen YU
Shangxuan LI
Yunyun XIE
Shaofeng LIU
Kang CHANG
GU Xueping
LIU Yan
LIU Weijia

Related Institution

NARI Group Corporation(State Grid Electric Power Research Institute)
State Key Laboratory of Smart Grid Protection and Control
Tongxiang Power Supply Company of State Grid Zhejiang Electric Power Co., Ltd., Tongxiang
School of Automation, Nanjing University of Science and Technology
School of Electrical Engineering, Zhejiang University
0