您当前的位置:
首页 >
文章列表页 >
综合考虑投资成本和经济收益的快速切回机组布点方案
更新时间:2025-08-13
    • 综合考虑投资成本和经济收益的快速切回机组布点方案

    • Automation of Electric Power Systems   Vol. 39, Issue 4, Pages: 46-51(2015)
    • Published:2015

    移动端阅览

  • LIU Chongru. [J]. Automation of electric power systems, 2015, 39(4): 46-51. DOI:

  •  
  •  

0

Views

2653

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Coordinated Planning for AC/DC Hybrid Distribution Networks Considering Equilibrium Between Economy and Resilience
Inertial Response Based Wind Turbine-Energy Storage Combined Black-start Power Source and Its Coordinated Control Method

Related Author

LI Baichen
WANG Xin
GUO Qi
TU Chunming
ZHANG Song
LI Tianlin
ZHANG Song
WU Weimin

Related Institution

Electric Power Science Research Institute of Guizhou Power Grid Co., Ltd.
National Engineering Research Center for Electrical Energy Conversion and Control (Hunan University)
Electric Power Science Research Institude of Guizhou Power Grid Co., Ltd.
Power Dispatch and Control Center of China Southern Power Grid
School of Science and Engineering, The Chinese University of Hong Kong
0