您当前的位置:
首页 >
文章列表页 >
基于广义联络线网省协调的两阶段实时发电计划模型
更新时间:2025-08-13
    • 基于广义联络线网省协调的两阶段实时发电计划模型

    • Automation of Electric Power Systems   Vol. 39, Issue 6, Pages: 128-133(2015)
    • Published:2015

    移动端阅览

  • ZHANG Yantao. [J]. Automation of electric power systems, 2015, 39(6): 128-133. DOI:

  •  
  •  

0

Views

2199

下载量

11

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

实时发电计划模型及其应用
Collaborative Planning of Virtual Power Plants Aggregating Multivariate and Flexible Resources and Balancing Fairness and Efficiency
Post-disaster Multi-source Cooperative Islanding Operation Strategy for Distribution Network Considering Mobile Energy Storage System Dispatching
Coordinated Day-ahead and Intra-day Rolling Scheduling Strategy for Electricity-Power Hybrid Energy Storage

Related Author

XU Fan
DONG Zhaoyang
WANG Licheng
WEN Fushuan
YANG Jiajia
LIANG Bomiao
HOU Beiping
SUN Xian

Related Institution

NARI Technology Development Co. Ltd.
Department of Electrical Engineering, City University of Hong Kong
College of Information Engineering, Zhejiang University of Technology
College of Electrical Engineering, Zhejiang University
College of Science and Engineering, James Cook University
0