您当前的位置:
首页 >
文章列表页 >
大规模跨区特高压直流水电网省两级协调优化方法
更新时间:2025-08-13
    • 大规模跨区特高压直流水电网省两级协调优化方法

    • Automation of Electric Power Systems   Vol. 39, Issue 1, Pages: 151-158(2015)
    • Published:2015

    移动端阅览

  • CHENG Xiong. [J]. Automation of electric power systems, 2015, 39(1): 151-158. DOI:

  •  
  •  

0

Views

4333

下载量

19

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Review on Energy-Logistics Coupled Optimal Dispatching Models and Methods for Port
Precise Peak-shaving Strategy at Demand Side Considering Response Reliability and Economy
Frequency Transient Model and Analytical Analysis of Interconnected System Considering Heat Storage of Thermal Power Boiler
Dynamic Settlement Method for Bilateral Transactions in Peak Shaving Ancillary Service Market for Interruptible Load

Related Author

LI Hao
TAI Nengling
YU Moduo
WANG Jie
HUANG Wentao
HUANG Yiwen
MA Peng
QI Jun

Related Institution

Key Laboratory of Control of Power Transmission and Conversion (Ministry of Education)
School of Smart Energy, Shanghai Jiao Tong University
School of Electrical and Electronic Engineering, Huazhong University of Science and Technology
Alxa Power Supply Company of Inner Mongolia Electric Power (Group) Co., Ltd.
China Electric Power Research Institute
0