您当前的位置:
首页 >
文章列表页 >
双馈感应发电机接入电网的三相短路电流峰值评估
更新时间:2025-08-13
    • 双馈感应发电机接入电网的三相短路电流峰值评估

    • Automation of Electric Power Systems   Vol. 38, Issue 18, Pages: 65-71(2014)
    • Published:2014

    移动端阅览

  • ZHOU Niancheng. [J]. Automation of electric power systems, 2014, 38(18): 65-71. DOI:

  •  
  •  

0

Views

2573

下载量

6

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

DC-link Dynamics Analysis and Optimal Control Strategy for Grid-forming DFIG-based Wind Turbines in Weak Grid
Equivalent Method of DFIG-based Wind Farm Considering Low Voltage Ride-through and Dynamics of Entire Fault Process
Refined Fault Calculation Model of Doubly-fed Induction Generator Considering Different Voltage Drops and Grid-side Converter Feed-out Current

Related Author

LI Shanying
QU Hanchen
WANG Hui
GAO Mingyang
ZHAO Shuqiang
XIE Zhen
LI Mengjie
XU Shang

Related Institution

State Grid Jibei Electric Power Co., Ltd.
State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources (North China Electric Power University)
School of Electrical Engineering and Automation, Hefei University of Technology
State Grid Shanghai Municipal Electric Power Company
School of Electrical and Power Engineering, Hohai University
0