thus the component failure rate is increasing over time. By considering the main outage types of generators
transformers and transmission lines
the corresponding increasing failure rate model is built. From the model
the average unavailability formula incorporating preventive maintenance is derived. Based on the reliability cost-benefit analysis and the average unavailability
the LOLP
EENS and the total cost of the system can be deduced as a function of the preventive maintenance cycles of components
respectively. A heuristic iterative algorithm is proposed
in which the sensitivity of the total system cost to each component preventive maintenance rate is ranked to find the optimal preventive maintenance. According to studies on RBTS and IEEE-RTS79
it is verified that the component optimal maintenance cycle varies with the type
capacity
reliability and the location of that component. Finally
the effects of the aging factor and unit power shortage cost on maintenance optimization are treated based on the RBTS system.