To solve the problem of highly reliable service with high efficiency to the core area of large cities
the service reliability is analyzed for the distribution grids with distribution automation systems (DAS) based on the historical reliability information of the 10 kV urban customers. It is pointed out that the requirement on very high reliability cannot be met merely with DAS. Some topologies with high efficiency are put forward based on the basic threedouble connection
such as
the differential threedouble connection
threedouble topology with multifeeders backup for each other and threedouble topology with multicouple of feeders backup for each other. The approach of coordination between the local control by relay protection and automatic backup switching and the centralized control by DAS is described. The principle of gradual upgrading with the increase of the load density is discussed as well.