您当前的位置:
首页 >
文章列表页 >
适应大规模风电接入的发电出力计划两阶段优化方法
更新时间:2025-08-13
    • 适应大规模风电接入的发电出力计划两阶段优化方法

    • Automation of Electric Power Systems   Vol. 38, Issue 9, Pages: 48-52(2014)
    • Published:2014

    移动端阅览

  • LI Lili. [J]. Automation of electric power systems, 2014, 38(9): 48-52. DOI:

  •  
  •  

0

Views

4055

下载量

8

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

计及机组组合状态调整的发电计划安全校正策略
Bi-level Optimization Model of Multiple Data Centers Considering Workload Features and Response Characteristics
Decision-making Method of Generation Scheduling Correction for Electricity Spot Market Clearing

Related Author

YAO Jianguo
YANG Zhenglin
GENG Jian
HONG Guoqing
WU Guoyang
JIN Yuqing
XIE Huan
JU Ping

Related Institution

State Grid Electric Power Research Institute
School of Electrical and Power Engineering, Hohai University
China Electric Power Research Institute
State Grid Jibei Electric Power Research Institute
School of Electrical Engineering, Dalian University of Technology
0