您当前的位置:
首页 >
文章列表页 >
大电网平台下抽水蓄能电站群短期多电网启发式调峰方法
更新时间:2025-08-13
    • 大电网平台下抽水蓄能电站群短期多电网启发式调峰方法

    • Automation of Electric Power Systems   Vol. 38, Issue 9, Pages: 53-60(2014)
    • Published:2014

    移动端阅览

  • CHENG Xiong. [J]. Automation of electric power systems, 2014, 38(9): 53-60. DOI:

  •  
  •  

0

Views

4197

下载量

9

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Evaluation Method for Adjustable Power Capacity of Hot Rolling Loads for Peak-regulation Demand
Non-cooperative Game Based Strategy for Energy-Intensive Industrial Load Participating in Peak-regulation Demand
Optimal Scheduling of Coupled Systems Considering Rapid Load Adjustment and Flexibility Supply-Demand Matching
Multi-layer Real-time Control Strategy of Electric Vehicle Aggregators for Peak Regulation of Power Grid
Deep Learning Based Fast Automatic Adjustment Method for Cross-section Power of Bulk Power Grid

Related Author

CAI Yunfan
XU Xiandong
YU Xiaodan
JIA Hongjie
HU Xiao
JIANG Tingyu
TAO Jinyu
WANG Ke

Related Institution

School of Electrical Engineering, Northeast Electric Power University
School of Electrical and Information Engineering, Tianjin University
Marketing Service Center of State Grid Jiangsu Electric Power Co., Ltd.
College of Energy and Electrical Engineering, Hohai University
Xi’an Thermal Power Research Institute Co., Ltd.
0