The influence of power capacity factor on congestion costs is analyzed from the angle of capacity constraint,load level and generation type.According to the incorporation of the power output duration curve in the transmission long-run incremental cost(T-LRIC)pricing model,a novel approach for pricing of transmission network with wind farms based on T-LRIC model is proposed,with the nodal power perturbation to network incremental cost taken into account.This model can further quantitatively analyze the power nodal charges with wind farms,reflect the contribution of capacity constraints,load level and generation features to the system,while effectively distinguishing the charges under similar capacity factors.The effectiveness of the model proposed is verified by analysis and calculation on a3-bus system and IEEE 30-bus system.
Calculation Model of Cross-zonal Medium- and Long-term Net Available Transfer Capability for Maximizing Social Welfare
Related Author
YANG Jiajia
ZHANG Haifeng
WU Jiang
GAO Feng
LIU Kun
SHI Zhihao
YANG Zaimin
SUN Siyang
Related Institution
College of Electrical Engineering,Zhejiang University
State Key Laboratory for Manufacturing Systems Engineering, Ministry of Education Key Lab for Intelligent Networks and Network Security, Xian Jiaotong University, Xian
Key Laboratory of Control of Power Transmission and Conversion, Ministry of Education (Shanghai Jiao Tong University)
Shanghai Non-carbon Energy Conversion and Utilization Institute
Energy Development Research Institute of China Southern Power Grid Co., Ltd.