您当前的位置:
首页 >
文章列表页 >
永久性负荷割接后变电站主变压器的负荷预测方法
更新时间:2025-08-13
    • 永久性负荷割接后变电站主变压器的负荷预测方法

    • Automation of Electric Power Systems   Vol. 38, Issue 16, Pages: 127-131(2014)
    • Published:2014

    移动端阅览

  • XIN Jieqing. [J]. Automation of electric power systems, 2014, 38(16): 127-131. DOI:

  •  
  •  

0

Views

2157

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Local Coordinated Voltage Control of Two-terminal DC Distribution Network Based on Voltage Compensation
Fault Line Selection and Location Method Based on Synchrophasor Measurement Unit for Distribution Network
Detection of High Impedance Grounding Fault in Distribution Network Based on Interval Slope Curves of Zero-sequence Current
A Method for Ascertaining Reasonable Maximum Value of Cellular Load in Spatial Load Forecasting
基于Softmax概率分类器的数据驱动空间负荷预测

Related Author

WANG Qianggang
SONG Jiahang
LIAO Jianquan
ZHOU Niancheng
XU Xiaolong
Feng DENG
Xiangjun ZENG
Li YU

Related Institution

College of Electric Engineering, Sichuan University
National Key Laboratory of Power Transmission Equipment Technology (Chongqing University)
College of Electrical and Information Engineering, Changsha University of Science & Technology
Digital Grid Research Institute of China Southern Power Grid
Electric Power Research Institute of China Southern Power Grid
0