基于最大供电能力的配电网馈线联络建设次序规划方法
更新时间:2025-08-13
    • 基于最大供电能力的配电网馈线联络建设次序规划方法

    • Automation of Electric Power Systems   Vol. 38, Issue 11, Pages: 49-55(2014)
    • Published:2014

    移动端阅览

  • XIAO Jun. [J]. Automation of electric power systems, 2014, 38(11): 49-55. DOI:

  •  
  •  

0

Views

2328

下载量

9

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Coupling Characteristic and Control Strategy for Loop Closing Device Based on Improved Phase Shifting Transformer Under Three-phase Asymmetry Condition
智能接地配电系统关键参数设计
含单相配电支路的配电网单相接地故障行波测距技术

Related Author

ZHANG Yumin
JI Xingquan
JIANG Haiyang
YANG Ming
CAI Fudong
WANG Chengfu
WANG Pengwei
XU Bingyin

Related Institution

Shandong Senter Electronic Co., Ltd.
Key Laboratory of Power System Intelligent Dispatch and Control of Ministry of Education (Shandong University)
College of Electrical Engineering and Automation, Shandong University of Science and Technology
School of Electrical and Electronic Engineering, Shandong University of Technology
Shandong Kehui Electric Power Automation Co., Ltd.
0