您当前的位置:
首页 >
文章列表页 >
克服磁暴的变压器集群无功损耗优化控制方法
更新时间:2025-08-13
    • 克服磁暴的变压器集群无功损耗优化控制方法

    • Automation of Electric Power Systems   Vol. 38, Issue 4, Pages: 32-37(2014)
    • Published:2014

    移动端阅览

  • WU Weili. [J]. Automation of electric power systems, 2014, 38(4): 32-37. DOI:

  •  
  •  

0

Views

2684

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Online Reactive Power Optimization Method Based on Data-driven Predictive Control for Distribution Network with Low Situation Awareness
Nash Equilibrium Based Optimal Control Method for Hydrogen Production System with Photovoltaic-Storage Coupling
Coordinated Optimal Reactive Power Control of Renewable Energy Base Considering Grid-forming Energy Storage Station
DC-link Dynamics Analysis and Optimal Control Strategy for Grid-forming DFIG-based Wind Turbines in Weak Grid

Related Author

QIAN Liqun
WEI Qing
HU Pengfei
YANG Zaixin
LIANG Zhonghao
WANG Lifang
LI Jianlin
LIN Li

Related Institution

Inner Mongolia Power (Group) Co., Ltd., Inner Mongolia Power Research Institute Branch
HuaDian Electric Research Institute Co., Ltd.
School of Electrical Engineering, Zhejiang University
National User-Side Energy Storage Innovation Research and Development Center (North China University of Technology)
University of Chinese Academy of Sciences
0