Firstly, the implication and characteristics of peaking service are discussed according to a comparison between peaking service and reserve service. Secondly, by analyzing the hydropower peaking cost, the opportunity cost of efficiency loss caused by frequent adjustment of hydropower output should be seriously considered. Then on the basis of the current ancillary services management and hydropower operation, an estimation method of hydropower peaking compensation is illustrated. The method consists in forming a free peaking interval by dipping and heaving a certain proportion of the daily average output; and then the water loss due to hydropower output below the lower-bound of the free peaking interval is analyzed. The water loss can be converted to profit loss, which can serve as the hydropower peaking compensation. An example is given to verify the correctness and validity of the method.
Analysis on Coupling Mechanism of Joint Clearing Electricity Prices in Electric Power Energy and Ancillary Service Markets
Review on Aggregation Characteristics and Trading Mechanisms of Virtual Power Plant for Enhancing System Response Capability
Analytical and Computational Method for System Balancing Cost Caused by Renewable Energy Accommodation
Bidding Strategy for Battery Swapping Station Participating in Electricity Energy and Frequency Regulation Market Considering Demand Response of Battery Swapping
Related Author
LIU Yue
ZHANG Zhong
YIN Zhenbin
SUN Changhai
WANG Fei
WANG Ge
XU Fei
PAN Qi
Related Institution
School of Electrical Engineering, Dalian University of Technology
State Key Laboratory of Power System Operation and Control (Tsinghua University)
School of Electrical and Electronic Engineering, North China Electric Power University
State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources (North China Electric Power University)
Department of Electrical Engineering, Tsinghua University