In power systems mainly consisting of thermal units, the time for units' start-up and restoration determines the duration of network reconfiguration following large-area blackout. Centralized-operation simulator for power plant is first employed to investigate the starting process of thermal units thereby establishing the relationship between start-up time and the cumulative downtime corresponding to typical unit types. Based on this, a parallel restoration strategy is proposed for reconstructing a power network. According to this strategy, the unit nodes are regarded as the load nodes with the highest priority and while being processed together with other load nodes. After available crank power in each stage is used as constraints, parallel restoration paths are optimized with Prim algorithm. Case studies with the IEEE 30-bus system verify that the reconfiguration scheme achieved can make full use of the crank power thereby restoring multi units and paths simultaneously so that the duration is reduced effectively. This is essential for organizing restoration scenarios rapidly and systematically following a large-scale blackout.
Review of Stability Analysis Methods and Improvement Measures for Power System Dominated by Multiple Virtual Synchronous Generators
Remote Offshore Wind Power Transmission Scheme Based on Diode Rectifier Unit and Modular Multilevel Converter with Black-start and Grid-forming Capability
Related Author
YAO Chenhao
XIONG Xiaoling
FENG Dingteng
LI Xiaobo
ZHAO Chengyong
HU Qinran
WU Shaohui
HAN Rushuai
Related Institution
State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources (North China Electric Power University)
State Grid Electric Power Research Institute (NARI Group Corporation)
State Grid Hefei Power Supply Company
School of Electrical Engineering, Southeast University
NARI Group Corporation (State Grid Electric Power Research Institute)