您当前的位置:
首页 >
文章列表页 >
可用输电容量协调决策的多目标机会约束规划模型与方法
更新时间:2025-08-13
    • 可用输电容量协调决策的多目标机会约束规划模型与方法

    • Automation of Electric Power Systems   Vol. 35, Issue 13, Pages: 37-43(2011)
    • Published:2011

    移动端阅览

  • YANG Yan, WEN Fushuan, LI Li, et al. [J]. Automation of electric power systems, 2011, 35(13): 37-43. DOI:

  •  
  •  

0

Views

2177

下载量

10

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

计及风险控制策略的电力系统可用输电容量决策
Optimal Scheduling Strategy of Farm Distribution Network for Power Supply Support for Production of Large-scale Crop Base
Optimal Control of Electric Vehicle Cluster Participating in Frequency Regulation Market Considering User Preferences

Related Author

YANG Yan
WEN Fushuan
GAO Chao
WANG Qingyuan
WANG Mingshen
MU Yunfei
CUI Li
ZHAO Nan

Related Institution

School of Electric Power,South China University of Technology
College of Electrical Engineering,Zhejiang University
Gaoyou Power Supply Company, State Grid Jiangsu Electric Power Co., Ltd.
School of Electric Power Engineering, Nanjing Institute of Technology
Electric Power Research Institute of State Grid Jiangsu Electric Power Co., Ltd.
0