Due to wind fluctuation and load disturbances,large scale energy storage system is required for maintaining power stability in a microgrid,especially with high penetration of wind power generation or no wind turbines during islanded mode.Huge battery energy storage system(BESS)is composed of lead-acid battery and power conditioning system(PCS).It is integrated into the microgrid.The architecture of the BESS is proposed and a new control method is presented to enable linear/nonlinear load sharing by parallel connected BESS without communication among them.The feature of lead-acid battery is investigated and the operation of PCS is introduced as well.The effectiveness of the BESS and proposed control method is verified through simulations and experiments.
Equivalent Projection Based Cooperative Optimal Operation Method for Multi-microgrid Flexible Distribution System
Review of Stability Analysis Methods and Improvement Measures for Power System Dominated by Multiple Virtual Synchronous Generators
Related Author
FANG Yan
LI Jinghua
LAN Fei
XIE Lingling
LAI Yening
FANG Yan
LI Jinghua
LAN Fei
Related Institution
Guangxi Key Laboratory of Power System Optimization and Energy Technology (Guangxi University)
State Grid Electric Power Research Institute (NARI Group Corporation)
Key Laboratory of Guangxi Electric Power System Optimization and Energy-saving Technologys (Guangxi University)
Key Laboratory of Modern Power System Simulation and Control & Renewable Energy Technology, Ministry of Education (Northeast Electric Power University)
School of Electrical Engineering, Southeast University