您当前的位置:
首页 >
文章列表页 >
考虑大规模风电接入的发电机组检修计划
更新时间:2025-08-13
    • 考虑大规模风电接入的发电机组检修计划

    • Automation of Electric Power Systems   Vol. 34, Issue 19, Pages: 20-24(2010)
    • Published:2010

    移动端阅览

  • FANG Chen, XIA Qing, SUN Xin. [J]. Automation of electric power systems, 2010, 34(19): 20-24. DOI:

  •  
  •  

0

Views

2644

下载量

16

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

MMC-HVDC系统主设备参数的非线性规划设计方法
基于低电压穿越去磁控制的风电场内部故障等值建模方法
基于外逼近方法的中期机组组合问题
基于非线性内点法的安全约束最优潮流:(二)算法实现
基于非线性内点法的安全约束最优潮流:(一)理论分析

Related Author

LI Peilin
LU Fei
LI Yin
ZHANG Boming
SUN Hongbin
WU Wenchuan

Related Institution

State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources (North China Electric Power University)
State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources, North China Electric Power University
State Key Lab of Power Systems, Department of Electrical Engineering, Tsinghua University
0