Jiuquan Wind Power Base(JQWPB) is the first 10 GW-level pilot wind power base in the world, whose construction is the first successful attempt to exploit wind energy in large scale and far away from the load center. By using the gauged wind resources data and the recent energy management system(EMS) operating data from the dispatching department, an analysis is made of the characteristics of wind power resources, and investigations are performed on the power characteristics of wind turbine generator, wind farm, wind farm cluster and the entire JQWPB. By comparing the wind power characteristics in different time scales, it has been found that the output power of the JQWPB has clear relevance to long time scale and is obviously complementary for short time scale. Also treated is the effect of wind power characteristics on power grid stability, peak load regulation and frequency control.
Reliable Regulation Capability Extraction Strategy for Cluster Electric Heating Load Considering Average Heating Demand
Safety Output Model with Tight Constraints and Flexible Regulation for Nuclear Power Plant Participating in Peak Load Regulation
考虑发电集团利益主体协调的风电消纳调度策略
计及风电—负荷耦合关系的含大规模风电系统调峰运行优化
考虑跨区直流调峰的日前发电计划优化方法及分析
Related Author
XING Aolan
ZHANG Liwei
JIANG Jing
YAN Gangui
LYU Shuaishuai
MU Gang
Hua WEI
Hong HU
Related Institution
Key Laboratory of Modern Power System Simulation and Control & Renewable Energy Technology, Ministry of Education (Northeast Electric Power University)
Guangxi Key Laboratory of Power System Optimization and Energy Technology(Guangxi University)
School of Electrical Engineering, Dalian University of Technology
State Key Laboratory of Advanced Electromagnetic Engineering and Technology(Huazhong University of Science and Technology)