您当前的位置:
首页 >
文章列表页 >
适合风电特性的联络线过载切机装置控制策略
更新时间:2025-08-13
    • 适合风电特性的联络线过载切机装置控制策略

    • Automation of Electric Power Systems   Vol. 34, Issue 15, Pages: 52-55(2010)
    • Published:2010

    移动端阅览

  • SONG Shaoqun, FU Chao, WANG Yi, et al. [J]. Automation of electric power systems, 2010, 34(15): 52-55. DOI:

  •  
  •  

0

Views

2261

下载量

4

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

含超前控制的风储系统滚动最优控制策略
计及送端风电调频能力的交直流混合电网频率紧急控制策略
Distributed Algorithm for Robust Economic Dispatch of Integrated Transmission and Distribution System Considering Wind Power Uncertainty
Collaborative Robust Planning of Electric and Thermal Flexibility Resources Considering Reserve Optimization

Related Author

LI Bin
LIU Yishi
CHI Yongning
LIU Chao
LIU Hongzhi
HUANG Xinyi
LIU Mingbo
LIN Shunjiang

Related Institution

Key Laboratory of Guangxi Electric Power System Optimization and Energy-saving Technology(Guangxi University)
School of Power Engineering, South China University of Technology
Guangdong Key Laboratory of Clean Energy Technology
State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources (North China Electric Power University)
0