您当前的位置:
首页 >
文章列表页 >
考虑负荷转移的检修计划安全校核优化方法
更新时间:2025-08-13
    • 考虑负荷转移的检修计划安全校核优化方法

    • Automation of Electric Power Systems   Vol. 34, Issue 16, Pages: 92-96(2010)
    • Published:2010

    移动端阅览

  • YAN Wei, LIN Ye, LUO Xibin, et al. [J]. Automation of electric power systems, 2010, 34(16): 92-96. DOI:

  •  
  •  

0

Views

2200

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Unified Clearing Method for Regional and Provincial Reserve Markets Considering Reserve Sharing
Bi-level Planning of Power System Considering Hybrid Carbon Leakage Effect
Multi-level Scheduling Cooperative Mode Based on Projection from Global to Local Operating Space
Two-stage Optimization of Medium- and Long-term Electricity Security Check Based on Security-constrained Unit Commitment

Related Author

SHI Peiran
GAO Ziwei
YI Zhongkai
XU Ying
CAI Qinqin
LIN Yujie
ZHANG Xiaoyan
XIONG Houbo

Related Institution

North China Branch of State Grid Corporation of China
State Grid Heilongjiang Electric Power Co., Ltd.
School of Electrical Engineering and Automation, Harbin Institute of Technology
Jiaxing Power Supply Company of State Grid Zhejiang Electric Power Co., Ltd.
College of Electrical Engineering, Zhejiang University
0