您当前的位置:
首页 >
文章列表页 >
葛洲坝换流站直流开路试验故障原因分析
更新时间:2025-08-13
    • 葛洲坝换流站直流开路试验故障原因分析

    • Automation of Electric Power Systems   Vol. 34, Issue 18, Pages: 103-107(2010)
    • Published:2010

    移动端阅览

  • HU Yuyang, TANG Kaiping, YU Shanshan. [J]. Automation of electric power systems, 2010, 34(18): 103-107. DOI:

  •  
  •  

0

Views

2438

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Fast Protection Scheme for Bipolar Face-to-face Modular Multilevel Converter Based DC Transformer
Problems Faced by Relay Protection in New Power System and Their Solution Ideas
Design of Bidirectional Z-source Solid-state DC Circuit Breaker with Low Loss
Pilot Protection Scheme for HVDC Transmission Line Based on Fault Component of Aerial Mode Current

Related Author

LIAO Jianquan
HU Chengbin
GAO Shilin
TAN Zipeng
WANG Yuhong
ZHENG Yuping
LYU Pengfei
LI Bin

Related Institution

College of Electrical Engineering, Sichuan University
NARI Group Corporation(State Grid Electric Power Research Institute)
China Electric Power Research Institute
School of Electrical Engineering, Xi’an Jiaotong University
Key Laboratory of the Ministry of Education on Smart Power Grids(Tianjin University)
0