您当前的位置:
首页 >
文章列表页 >
考虑发电容量适应性的多目标输电网规划
更新时间:2025-08-13
    • 考虑发电容量适应性的多目标输电网规划

    • Automation of Electric Power Systems   Vol. 33, Issue 23, Pages: 19-23(2009)
    • Published:2009

    移动端阅览

  • QU Gang, CHENG Haozhong, MA Zeliang, et al. [J]. Automation of electric power systems, 2009, 33(23): 19-23. DOI:

  •  
  •  

0

Views

2154

下载量

6

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Planning of Electric Vehicle Charging-Swapping-Storage Integrated Station in AC/DC Distribution Network
Two-step Planning of Grid-Resource-Storage Based on Cluster Partition
考虑电气转换储能和可再生能源集成的微能源网多目标规划
含电动汽车充电负荷的交直流混合微电网规划

Related Author

Yu MA
Chenke HE
Hongtao YUAN
Lan ZHU
Gang WEI
Menglong ZENG
Ming DING
Di HU

Related Institution

College of Electrical Engineering, Shanghai University of Electric Power
East China Electric Power Design Institute Co., Ltd.
School of Electric Power, South China University of Technology
Anhui Provincial Engineering Laboratory for Renewable Energy and Energy Saving, Hefei University of Technology
Key Laboratory of Control of Power Transmission and Conversion, Ministry of Education(Shanghai Jiao Tong University)
0