您当前的位置:
首页 >
文章列表页 >
基于IEC 61400-25的风电场风力发电机组配置
更新时间:2025-08-13
    • 基于IEC 61400-25的风电场风力发电机组配置

    • Automation of Electric Power Systems   Vol. 34, Issue 5, Pages: 91-95(2010)
    • Published:2010

    移动端阅览

  • ZHONG Heng, DUAN Bin, SU Yongxin, et al. [J]. Automation of electric power systems, 2010, 34(5): 91-95. DOI:

  •  
  •  

0

Views

2724

下载量

4

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

提高智能变电站自动化系统工程实施效率的思路与实践
风电场群远程集中SCADA系统设计
风电场IEC 61400-25到OPC XML-DA的映射实现与应用
基于MMS的风电设备信息模型获取方法
风电场监控通信安全解决方案

Related Author

HU Shaoqian
HUANG Xiaoshu
ZUO Jianfei
YE Jianbin
HE Wei
HUANG Lingxiang
YANG Wei
LONG Xin

Related Institution

NR Electric Co. Ltd.
State Grid Electric Power Research Institute
Changan Sub-bureau of Xian Electric Power Supply Bureau, Xian
Hara XEMC Windpower Co. Ltd.
Beihai Yinhe Hi-tech Industrial Co Ltd
0