您当前的位置:
首页 >
文章列表页 >
以合格率最大为目标的电力系统状态估计新方法
更新时间:2025-08-13
    • 以合格率最大为目标的电力系统状态估计新方法

    • Automation of Electric Power Systems   Vol. 33, Issue 16, Pages: 40-43(2009)
    • Published:2009

    移动端阅览

  • DONG Shufeng, HE Guangyu, SUN Yingyun, et al. [J]. Automation of electric power systems, 2009, 33(16): 40-43. DOI:

  •  
  •  

0

Views

2466

下载量

14

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

一种电力系统量测噪声自适应抗差状态估计方法
转移潮流法拓扑错误辨识
基于测量不确定度的电力系统状态估计(三)算法比较
计及PMU的混合非线性状态估计新方法

Related Author

CHEN Yanbo
CHEN Yanbo
ZHOU Jingyang
YU Erkeng
LI Qiang
WANG Lei
HE Guangyu
DONG Shufeng

Related Institution

State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources, North China Electric Power University
China Electric Power Research Institute
State Key Laboratory of Power Systems, Department of Electrical Engineering, Tsinghua University
Key Laboratory of Power System Protection and Dynamic Security Monitoring and Control Under Ministry of Education, North China Electric Power University
Sifang Research Institute, North China Electric Power University
0