您当前的位置:
首页 >
文章列表页 >
电力系统运行风险评估中元件时变停运模型分析
更新时间:2025-08-13
    • 电力系统运行风险评估中元件时变停运模型分析

    • Automation of Electric Power Systems   Vol. 33, Issue 16, Pages: 7-12(2009)
    • Published:2009

    移动端阅览

  • NING Liaoyi, WU Wenchuan, ZHANG Boming. [J]. Automation of electric power systems, 2009, 33(16): 7-12. DOI:

  •  
  •  

0

Views

2863

下载量

41

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

运行风险评估中的变压器时变停运模型(二)基于延迟半马尔可夫过程的变压器时变停运模型
运行风险评估中的变压器时变停运模型(一)基于运行工况的变压器内部潜伏性故障的故障率估计方法
Evaluation of Compound-disaster Failure Rate for Transmission Lines from Perspective of Whole Reductionism Thinking —Part Two Algorithm and Application
Evaluation of Compound-disaster Failure Rate for Transmission Lines from Perspective of Whole Reductionism Thinking —Part One Framework Design
Reliability Assessment of DC Distribution System with Truncation-coefficient-based State Merging

Related Author

ZHANG Boming
WU Wenchuan
NING Liaoyi
XUE Yusheng
CHANG Kang
YU Chen
XUE Feng
HAN Xiaoqing

Related Institution

State Key Lab of Power Systems, Department of Electrical Engineering, Tsinghua University
State Grid Electric Power Research Institute (NARI Group Corporation)
School of Electrical Engineering and Automation, Harbin Institute of Technology
College of Electrical and Power Engineering, Taiyuan University of Technology
Dispatching and Control Center of State Grid Qinhuangdao Electric Power Supply Company
0