The necessity and feasibility to construct energy management system(EMS)and substation control system to a double-core redundant integrated system are analyzed. The specific implementation plan and principles of data sampling, graphic data display, application materials management as well as business database synchronization are indicated and expounded. The design can enhance the reliability of EMS and substation control system.