您当前的位置:
首页 >
文章列表页 >
确定性合同分解中异常负荷数据的识别与修正
更新时间:2025-08-13
    • 确定性合同分解中异常负荷数据的识别与修正

    • Automation of Electric Power Systems   Vol. 33, Issue 6, Pages: 21-24(2009)
    • Published:2009

    移动端阅览

  • CHEN Jianhua, DAI Tiechao, ZHANG Ning, et al. [J]. Automation of electric power systems, 2009, 33(6): 21-24. DOI:

  •  
  •  

0

Views

2189

下载量

8

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Medium- and Long-term Contract Energy Decomposition Model for Cascade Hydropower Station Considering Spot Market Bidding Space
确定性电量分解算法实证分析
Calculation Model of Cross-zonal Medium- and Long-term Net Available Transfer Capability for Maximizing Social Welfare

Related Author

Xuguang YU
Yapeng LI
Zebin JIA
Gang LI
Chuntian CHENG
Rui CAO
ZHANG Ning
DAI Tiechao

Related Institution

Institute of Hydropower & Hydroinformatics, Dalian University of Technology
Dalian Key Laboratory of Clean Energy Efficient Utilization
Zhejiang Power Company
Key Laboratory of Control of Power Transmission and Conversion, Ministry of Education (Shanghai Jiao Tong University)
Shanghai Non-carbon Energy Conversion and Utilization Institute
0