您当前的位置:
首页 >
文章列表页 >
考虑风电接入后二次备用需求的优化潮流算法
更新时间:2025-08-13
    • 考虑风电接入后二次备用需求的优化潮流算法

    • Automation of Electric Power Systems   Vol. 33, Issue 8, Pages: 25-28(2009)
    • Published:2009

    移动端阅览

  • ZHANG Guoqiang, ZHANG Boming. [J]. Automation of electric power systems, 2009, 33(8): 25-28. DOI:

  •  
  •  

0

Views

2442

下载量

17

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Optimal Power Flow of Integrated Hydrogen-Electricity Energy System Based on Reduced-dimension Projection
Review on Optimization Methods for New Power System Dispatch Based on Deep Reinforcement Learning
Collaborative Forecasting Method for Short-term Wind Power Based on Vertical Federated Learning
Review and Prospect of Inter-Regional and Inter-Provincial Power Trading in China

Related Author

PENG Hongyi
YAN Mingyu
ZHOU Yijia
PENG Hongyi
YAN Mingyu
ZHOU Yijia
FENG Bin
HU Yijie

Related Institution

State Key Laboratory of Advanced Electromagnetic Engineering and Technology (Huazhong University of Science and Technology)
State Key Laboratory of Advanced Electromagnetic Engineering and Technology (School of Electrical and Electronic Engineering, Huazhong University of Science and Technology)
College of Electrical Engineering, Zhejiang University
Zhijiang Laboratory
School of Electrical Engineering, Xi'an Jiaotong University
0