您当前的位置:
首页 >
文章列表页 >
基于机会约束2层规划的输电线路检修计划优化
更新时间:2025-08-13
    • 基于机会约束2层规划的输电线路检修计划优化

    • Automation of Electric Power Systems   Vol. 33, Issue 2, Pages: 25-29(2009)
    • Published:2009

    移动端阅览

  • XU Xufeng, HUANG Minxiang, WANG Tingting, et al. [J]. Automation of electric power systems, 2009, 33(2): 25-29. DOI:

  •  
  •  

0

Views

2610

下载量

9

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Optimal Scheduling Strategy of Farm Distribution Network for Power Supply Support for Production of Large-scale Crop Base
Multi-dimensional Resilience Enhancement Strategy for Distribution Network During Typhoon Based on Improved Normal Constraints Method
Regulation Strategy of Waste Heat Compensation System for Data Center Considering Thermo-Electric Load Mismatch

Related Author

WANG Qingyuan
WANG Mingshen
MU Yunfei
CUI Li
ZHAO Nan
GE Le
LIU Hong
CAO Ruizhi

Related Institution

Gaoyou Power Supply Company, State Grid Jiangsu Electric Power Co., Ltd.
School of Electric Power Engineering, Nanjing Institute of Technology
Electric Power Research Institute of State Grid Jiangsu Electric Power Co., Ltd.
Key Laboratory of Smart Grid of Ministry of Education (Tianjin University)
Key Laboratory of the Ministry of Education on Smart Power Grids (Tianjin University)
0