您当前的位置:
首页 >
文章列表页 >
一种改进的OPA模型及大停电风险评估
更新时间:2025-08-13
    • 一种改进的OPA模型及大停电风险评估

    • Automation of Electric Power Systems   Vol. 32, Issue 13, Pages: 1-5(2008)
    • Published:2008

    移动端阅览

  • MEI Shengwei, HE Fei, ZHANG Xuemin, et al. [J]. Automation of electric power systems, 2008, 32(13): 1-5. DOI:

  •  
  •  

0

Views

4623

下载量

30

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

基于输电网扩展规划的OPA模型
偏度风险价值下供电公司/电力零售公司动态购电组合策略
基于分形条件风险价值的供电公司动态购电组合模型
考虑电网拓扑演化的连锁故障模型
期权交易对供电公司购电组合的影响

Related Author

DAI Jiang
ZHANG Yucheng
DONG Guangde
ZHU Jinfeng
WANG Shao
FANG Risheng
YANG Shouhui
WEN Fushuan

Related Institution

State Key Laboratory of Power Transmission Equipments & System Security and New Technology, Chongqing University
South China University of Technology
Zhejiang University
Fujian Electric Power Company Limited
North China Electric Power University
0