Based on an analysis of mal-operation of a relay protection in a 500 kV power system, this paper points out the problems in the coordinative setting of phase-separated pilot protection with ETL500 series power line carrier terminal. Misunderstanding of the coordinative relation between them is cleared up. According to the order priority principle of the ETL500 series power line carrier terminal, the correct connection scheme between the relay and ETL500 series power line carrier terminal is presented.
Analysis on Transient Characteristics of Neutral Point Grounding Resistor Throw-in in Flexible Grounded System
Optimal Configuration Scheme of Multi-staged Protection in Distribution Network for Integration of High Proportion of Distributed Photovoltaic
Protection for AC Collection Line of Offshore Wind Power Based on Ratio of Transient Negative-sequence Current Accumulation
Analysis and Protection of Single-phase-to-ground Fault on Valve Side of Interface Transformer in VSC-HVDC System with Symmetrical Monopolar Configuration
Related Author
LIU Cuicui
LIU Xiao
XUE Yongduan
XU Bingyin
WANG Xihao
LIANG Ying
YU Yue
WANG Congbo
Related Institution
State Grid of China Technology College
College of New Energy, China University of Petroleum (East China)
Tai’an Power Supply Company of State Grid Shandong Electric Power Company, Tai’an
Research Center for Smart Grid, Shandong University of Technology
State Key Laboratory of Power Grid Safety (China Electric Power Research Institute)