您当前的位置:
首页 >
文章列表页 >
电力系统多级负荷预测及其协调问题(三)关联协调模型
更新时间:2025-08-13
    • 电力系统多级负荷预测及其协调问题(三)关联协调模型

    • Automation of Electric Power Systems   Vol. 32, Issue 9, Pages: 20-24(2008)
    • Published:2008

    移动端阅览

  • MU Tao, KANG Chongqing, XIA Qing, et al. [J]. Automation of electric power systems, 2008, 32(9): 20-24. DOI:

  •  
  •  

0

Views

1785

下载量

7

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

电力系统多级负荷预测及其协调问题(二)基本协调模型
电力系统多级负荷预测及其协调问题(四)约束最小二乘可信度
电力系统多级负荷预测及其协调问题:(一)研究框架
Ultra-short-term Load Forecasting Considering Missing Data in Anomalous Scenarios
Bi-level Energy Scheduling Strategy for Hydrogen-powered Ships Combined with Multi-step Load Forecasting

Related Author

LI Jiawen
SUN Yonghui
WANG Sen
ZHANG Ziwei
WANG Yao
JIANG Jundao
ZOU Liang
LIU Xingdou

Related Institution

Tianjin Electricity Dispatching Centre
College of Artificial Intelligence and Automation, Hohai University
School of Applied Technology, Nanjing Institute of Technology
School of Electrical Engineering, Shandong University
College of Information Science and Engineering, Northeastern University
0