您当前的位置:
首页 >
文章列表页 >
梯级水电站实时发电补偿调度风险分析
更新时间:2025-08-13
    • 梯级水电站实时发电补偿调度风险分析

    • Automation of Electric Power Systems   Vol. 32, Issue 7, Pages: 30-33(2008)
    • Published:2008

    移动端阅览

  • ZHONG Pingan, CAI Jie, LI Yuansheng, et al. [J]. Automation of electric power systems, 2008, 32(7): 30-33. DOI:

  •  
  •  

0

Views

2152

下载量

5

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

基于决策树的梯级水电站泄流补偿调度风险分析
Reserve Optimization and Real-time Scheduling of Frequency Regulation Ancillary Service with Participation of Flexible Resource on Demand Side
Risk Estimation of Cyber Threat to Substation Based on Cyber-net and Learning Algorithm
关于能源转型分析的评述:(二)不确定性及其应对
基于贝叶斯网络的智能变电站风险关联模型

Related Author

XU Bin
CAI Jie
ZHANG Mengran
ZHONG Pingan
Zhouyang WU
Xin AI
Junjie HU
Shipeng ZHANG

Related Institution

Three Gorges Cascade Dispatching and Communication Center
National Engineering Research Center for Water Resources Efficient Utilization and Engineering Safety
College of Hydrology and Water Resource, Hohai University
State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources, North China Electric Power University
Ministry of Education Key Lab for Intelligent Networks and Network Security (Xi’an Jiaotong University)
0