您当前的位置:
首页 >
文章列表页 >
考虑高风险连锁故障的PMU配置方法
更新时间:2025-08-13
    • 考虑高风险连锁故障的PMU配置方法

    • Automation of Electric Power Systems   Vol. 32, Issue 4, Pages: 11-14(2008)
    • Published:2008

    移动端阅览

  • CHEN Xiaogang, TAO Jia, JIANG Quanyuan, et al. [J]. Automation of electric power systems, 2008, 32(4): 11-14. DOI:

  •  
  •  

0

Views

2590

下载量

6

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

基于风险的电网调度操作最佳供电路径生成策略
Emergency Control Combined with Adjustment and Tripping Against Cascading Failures Based on Decision Space Pruning Reinforcement Learning
Assessment of Cascading Failures for Gas-Electricity Interconnected System Considering Non-isothermal Characteristics of Natural Gas
Identification of Critical Lines for Cascading Failures Considering Fault Voltage Ride-through Characteristics of Wind Turbines

Related Author

JIANG Huilan
LUO Chenhao
LIU Xing
YAO Xiuli
WEI Zhenbo
LUO Zihang
FAN Ziyuan
CHEN Ge

Related Institution

Key Laboratory of Smart Grid of Ministry of Education, Tianjin University
Wuxi Power Supply Company of State Grid Jiangsu Electric Power Company
Human Resources Development and Archives Center of Sichuan Provincial Water Resources
School of Electrical Engineering, Sichuan University
School of Electric Power Engineering, South China University of Technology
0