您当前的位置:
首页 >
文章列表页 >
发电系统中旋转备用方案的风险分析与效用决策
更新时间:2025-08-13
    • 发电系统中旋转备用方案的风险分析与效用决策

    • Automation of Electric Power Systems   Vol. 32, Issue 3, Pages: 9-13(2008)
    • Published:2008

    移动端阅览

  • QI Xianjun, DING Ming. [J]. Automation of electric power systems, 2008, 32(3): 9-13. DOI:

  •  
  •  

0

Views

2180

下载量

12

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Reserve Optimization and Real-time Scheduling of Frequency Regulation Ancillary Service with Participation of Flexible Resource on Demand Side
Risk Estimation of Cyber Threat to Substation Based on Cyber-net and Learning Algorithm
关于能源转型分析的评述:(二)不确定性及其应对
基于贝叶斯网络的智能变电站风险关联模型
基于风险的输电断面经济输电功率计算

Related Author

Zhouyang WU
Xin AI
Junjie HU
Shipeng ZHANG
Hao SUN
Xiaohong GUAN
Zhiyuan YANG
SHU Yinbiao

Related Institution

State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources, North China Electric Power University
Ministry of Education Key Lab for Intelligent Networks and Network Security (Xi’an Jiaotong University)
Guangdong Electric Power Design Institute Co., Ltd. of China Energy Engineering Group
State Grid Corporation of China
School of Information Engineering, Northeast Dianli University
0