您当前的位置:
首页 >
文章列表页 >
引入保险机制的可中断合同设计
更新时间:2025-08-13
    • 引入保险机制的可中断合同设计

    • Automation of Electric Power Systems   Vol. 31, Issue 16, Pages: 19-23(2007)
    • Published:2007

    移动端阅览

  • CHEN Haohui, CHENG Yu, ZHANG Lizi. [J]. Automation of electric power systems, 2007, 31(16): 19-23. DOI:

  •  
  •  

0

Views

2416

下载量

9

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Bidding Mechanism Design for Building Virtual Power Plant to Participate in Demand Response Markets
Review on Characteristics and Models of Demand Response Behavior in Market Environment
Optimal Configuration of Shared Energy Storage in Industrial Park Considering Full-cycle Economic Benefits in Electricity Market Environment
Reliability Pricing Method Based on Improved Long-run Incremental Cost Method
Preliminary Study on Mechanism and Benefit Analysis of Load Response for Electricity-Carbon Market Collaboration

Related Author

QI Taoyi
HUI Hongxun
YE Chengjin
DING Yi
ZHAO Yuming
SONG Yonghua
WANG Ke
WU Feng

Related Institution

State Key Laboratory of Internet of Things for Smart City (University of Macau), Macau
College of Electrical Engineering, Zhejiang University
Shenzhen Power Supply Bureau Co., Ltd.
School of Electrical Engineering and Power, Hohai University
China Electric Power Research Institute
0