您当前的位置:
首页 >
文章列表页 >
配电网检修计划优化模型
更新时间:2025-08-13
    • 配电网检修计划优化模型

    • Automation of Electric Power Systems   Vol. 31, Issue 1, Pages: 33-37(2007)
    • Published:2007

    移动端阅览

  • HUANG Xianchao, ZHANG Lizi, SHU Jun, et al. [J]. Automation of electric power systems, 2007, 31(1): 33-37. DOI:

  •  
  •  

0

Views

1878

下载量

19

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

配电网多故障抢修与供电恢复联合优化模型
电力信息物理系统需求操控攻击策略及防护分析
Three-phase Dynamic State Estimation for Distribution Network in Event-triggered Mechanism
Prospect of New Low-voltage Distribution System Technology Driven by Carbon Emission Peak and Carbon Neutrality Targets
Bi-level Optimization Model of Multiple Data Centers Considering Workload Features and Response Characteristics

Related Author

HUANG Xianchao
YAN Kang
LU Yidan
BAI Xiaoqing
LI Bin
HUANG Manyun
XU Qiying
SUN Guoqiang

Related Institution

State Key Laboratory of Alternate Electric Power System with Renewable Energy Sources, North China Electric Power University
School of Electrical and Power Engineering, Hohai University
Research Center of Smart Energy Technology, School of Electric Power, South China University of Technology
School of Electrical and Electronic Engineering, North China Electric Power University
0