Distributed generation(DG) may inject harmonic current to connected distribution systems due to the power electronic converters. This paper proposes an optimization method for computing the maximum penetrating level of multiple distributed generators,taking into account of harmonic distortion constraints. It is analyzed how the location and output of distributed generators affect the penetrating level,and a bi-level optimization model is presented to accommodate this effect. Numerical algorithms are described in details in the paper,together with test results of a Hangzhou distribution network.
Value-oriented Photovoltaic Power Forecasting Method for Operation Revenue Improvement of Photovoltaic-Energy Storage Plants
Bi-level Optimal Control Strategy for Heating, Ventilation, and Air Conditioning System with Collaborative Consideration of Air Quality and Thermal Comfort
Bidding Strategy of Load Aggregators and Market Equilibrium Analysis for Multi-variety Electricity Market Trading
Related Author
LIU Hong
CAO Ruizhi
HAN Jun
CAI Chao
PAN Wenjie
LI Junkai
XU Duo
XU Xiaoyuan
Related Institution
Key Laboratory of the Ministry of Education on Smart Power Grids (Tianjin University)
State Grid Jiangsu Economic Research Institute
Key Laboratory of Control of Power Transmission and Conversion, Ministry of Education (Shanghai Jiao Tong University)
Shanghai Non-carbon Energy Conversion and Utilization Institute