您当前的位置:
首页 >
文章列表页 >
分阶段实现数字化变电站系统的工程方案
更新时间:2025-08-13
    • 分阶段实现数字化变电站系统的工程方案

    • Automation of Electric Power Systems   Vol. 31, Issue 5, Pages: 90-93(2007)
    • Published:2007

    移动端阅览

  • SUN Yimin, LI Yanxin, LI Qiang. [J]. Automation of electric power systems, 2007, 31(5): 90-93. DOI:

  •  
  •  

0

Views

2115

下载量

42

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

基于IEC 61850 GOOSE技术的继电保护工程应用
Discussion on Engineering Application of Conformance Test for IEC 61850 Control Model
Logical Node Based Topology Identification of Distributed Feeder Automation
Application of XMPP and GOOSE in Distributed Feeder Automation

Related Author

ZHU Bingquan
WANG Song
LI Hui
LIU Jun
HUANG Xiaoming
JIANG Jianning
Zhenzhen WANG
Dan SUN

Related Institution

Zhejiang Electric Power Dispatching & Communication Center
Zhejiang Electric Power Test & Research Institute
Zhejiang Electric Power Design Institute
State Grid Electric Power Research Institute
State Key Laboratory of Smart Grid Protection and Control
0