您当前的位置:
首页 >
文章列表页 >
瀑布沟电站600 MW大型水轮发电机主保护优化设计
更新时间:2025-08-13
    • 瀑布沟电站600 MW大型水轮发电机主保护优化设计

    • Automation of Electric Power Systems   Vol. 30, Issue 14, (2006)
    • Published:2006

    移动端阅览

  • XIA Yongjun, YIN Xianggen, ZHANG Zhe, et al. [J]. Automation of electric power systems, 2006, 30(14). DOI:

  •  
  •  

0

Views

1583

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

大电网机电暂态仿真数值收敛性的自动识别和提高
基于FPGA的光伏发电系统暂态实时仿真
基于能量信息的变压器励磁涌流识别方法
基于平均化理论的PWM变流器电磁暂态快速仿真方法:(二)适用PWM变流器分段平均模型的改进EMTP算法

Related Author

HONG Zeqi
PENG Huimin
WANG Chengshan
HUANG Shaofeng
XU Yin
PENG Ke
WANG Chengshan
LI Yan

Related Institution

School of Electrical Engineering, Beijing Jiaotong University
NARI Technology Co. Ltd.
Key Laboratory of Smart Grid of Ministry of Education, Tianjin University
State Key Laboratory of New Energy Power System, North China Electric Power University
Department of Electrical Engineering, Tsinghua University
0