您当前的位置:
首页 >
文章列表页 >
基于相关邻近点与峰谷荷修正的短期负荷时间序列预测
更新时间:2025-08-13
    • 基于相关邻近点与峰谷荷修正的短期负荷时间序列预测

    • Automation of Electric Power Systems   Vol. 30, Issue 14, (2006)
    • Published:2006

    移动端阅览

  • TANG Wei, GU Zi. [J]. Automation of electric power systems, 2006, 30(14). DOI:

  •  
  •  

0

Views

1600

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Short-term Residential Load Forecasting Based on Dynamic Association Graph Attention Networks for Virtual Power Plant
Characteristic Analysis and Load Forecasting Based on Bayesian Method and Interpretable Machine Learning
Short-term Load Forecasting for Integrated Energy System Based on Coupling Features and Multi-task Learning

Related Author

FENG Changsen
QIAN Yifei
SHAO Liang
WEN Fushuan
ZHANG Youbing
ZHANG Junkai
HU Xuguang
LIU Yaobo

Related Institution

College of Electrical Engineering, Zhejiang University
College of Information Engineering, Zhejiang University of Technology
College of Information Science and Engineering, Northeastern University
Hainan Power Transmission and Transformation Maintenance Branch of Hainan Power Grid Co., Ltd., Haikou 570100, China
Power Dispatching and Control Centre of China Southern Power Grid, Guangzhou 510663, China
0